GGreenKey
The studio

A studio, not a supplier.

GreenKey was founded in 2003 to bring architect-grade specification discipline to a market dominated by box-shifters. Twenty-two years later, that's still the only thing we do.

Story

From a converted print works in Clerkenwell.

GreenKey began with a single contract — a 1920s mews house in north London — and a refusal to specify a system we hadn't first pulled apart on the bench.

Two decades on we work on roughly seventy projects a year, from single-window heritage replacements to 400-opening developments. The discipline is the same as the first job: model it, specify it, install it ourselves.

Our studio sits in a converted print works in Clerkenwell. Our workshop and manufacturing partner is in Bavaria. Our installation teams are direct-employed and based in London, Edinburgh and Dublin.

Vision

To make architect-grade facade specification accessible to anyone who cares enough to ask for it.

Mission

One studio, end to end. Every project signed off by the same person who surveyed it.

By the numbers

A measured record.

22
Years specifying
1,400+
Projects delivered
0.7
W/m²K best-in-class U-value
98%
Repeat-client rate
Principles

What we hold to.

Engineered, not assembled

Every system is specified to project — thermal modelling, structural calculation, and acoustic targets agreed before the first cut.

One studio, end to end

Survey, design, manufacture, install. No subcontracted handovers, no diluted accountability.

Heritage-grade craft

Welded corner joinery, hand-finished hardware, and PPG PVDF coatings warranted for 25 years against fade and chalk.

Quiet performance

Acoustic glazing to Rw 45 dB, triple seals on every opening leaf — designed for homes near roads, rails and runways.

Start a project

Begin with a brief.

Send us a drawing, a brief, or a site address. We'll come back inside three working days with an honest specification and a fixed quote.